Periodic P-field based Simulator

Jean-Laurent Mallet and Arben Shtuka. ( 1997 )
in: 16th gOcad Meeting (Dallas), ASGA

Abstract

There are many situations where important economicdecisions are based on models of the subsurface. However, due ta the lack for precise data, these models can not be considered as fully reliable and uncertainties [6] have ta be integrated into the decision making process. In this article, we present a special case of the P-field method particularly well suited for assessing these uncertainties.

Download / Links

    BibTeX Reference

    @inproceedings{MalletRM1997c,
     abstract = { There are many situations where important economicdecisions are based on models of the subsurface. However, due ta the lack for precise data, these models can not be considered as fully reliable and uncertainties [6] have ta be integrated into the decision making process. In this article, we present a special case of the P-field method particularly well suited for assessing these uncertainties. },
     author = { Mallet, Jean-Laurent AND Shtuka, Arben },
     booktitle = { 16th gOcad Meeting (Dallas) },
     month = { "november" },
     publisher = { ASGA },
     title = { Periodic P-field based Simulator },
     year = { 1997 }
    }